Sale!
Tsurumi HS2.4S MANUAL ELECTRIC SUBMERSIBLE PUMP 3180GPH – HS2.4S
Original price was: $438.00.$373.00Current price is: $373.00.
Motor Output (HP) – 1/2
Phase – Single
Discharge Bore (in.) – 2
Voltage/Amp – 110/5.4
Cable Length (ft.) – 20
Dimension (Dia x H, in.) – 10-1/16 x 12-15/16
Continuous Running Water Level (in.) – 3.5
Pump Weight (lbs.) – 30
Description
Durable trash pumps in 2 inches discharge & 1/2HP. Designed to pump water containing sand, solids and debris with minimal wear and clogging.
- Built-in shaft mounted agitator suspends solids.
- Urethane Semi Vortex Impeller for maximum durability and pump performance.
- Dual inside mechanical seal with SiC faces for longer life.
- Oil Lifter provides lubrication of the seal faces. (Patented)
- V-Ring Seal design protects mechanical seal from abrasive particles.
Click Here for Instruction Manual
Additional information
| Manufacturer | |
|---|---|
| Series | Manual Electric |
| Pond Product Type | Pond Pumps |
| Pump Type | |
| Max Flow Rate Range | |
| Max Flow Rate |







